Assembly of ventilation ducts using Gebhardt joints The sectional frame is prepared for the insertion of pop rivets • Holes are drilled in all four corners – 8 holes in total, as preparation for putting pop rivets in the sectional frame. • When working with cut duct sections, the frame is screwed in place with self-tapping screws. 45
RkJQdWJsaXNoZXIy NzAwNg==