E. Klink Assembly Guide

Installation of circular, classified E. Klink ducts 17 Wall penetration in a plasterboard wall • If the duct does not cut a wall stud, the backstop can be butted against the wall’s soundabsorbing batts. • Soundabsorbing batts in the wall can be advantageously done using hard batts. A better holddown in the backstop is achieved.

RkJQdWJsaXNoZXIy NzAwNg==